© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
D1343
28
Electrical Connection
Figure 12
Remove the cover plate at the back of the machine.
Using copper conductors only, connect the power
cable to the connectors. Refer to the instructions listed
on the machine’s decal on how to connect the
machine.
Machine without Electric Heating
Connect 200-240V single phase (1AC) to the
connectors “N” and “L1”. The green/yellow
grounding clamp has to be the grounding wire “PE”.
Machine with Electric Heating
200-240V 3AC
200-240V 3 phase (3AC) should be connected to the
connectors “L1, L2, L3”. Refer to Figure 12.
The green/yellow grounding clamp has to be
connected to the grounding wire “PE”.
380-415V 3AC + N
380-415V 3 phase (3AC + N) has to be connected to
the connectors “L1, L2, L3”, the blue neutral to the
“N” connector. Refer to Figure 12.
The green/yellow grounding clamp has to be
connected to the grounding wire “PE”.
After electrical installation is complete, run the
machine through a test cycle and check for a clockwise
basket rotation during the extract step. If rotation is not
clockwise, disconnect the power from the machine and
have a qualified electrician reverse any 2 motor leads
at the AC drive terminal block.
CFD628N