EasyManuals Logo

Allied Telesis AT-FS716 User Manual

Allied Telesis AT-FS716
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
AT-FS716 Series and AT-FS724i Installation Guide
13
Note
The switch performs a self-diagnostic test upon power up. This takes
about 20 seconds to complete.
6. Connect the twisted pair cables to a twisted pair ports on the switch and on
the end-nodes.
7. Power ON the end-nodes connected to the switch.
8. Check that the LINK/ACTIVITY LED for each port on the switch is green.
If a LED is OFF, refer to “Troubleshooting” on page 15.
The switch is now ready for use.
Warranty Registration
When you finish installing the product, you should register you product by
completing the enclosed warranty card and sending it in.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis AT-FS716 and is the answer not in the manual?

Allied Telesis AT-FS716 Specifications

General IconGeneral
BrandAllied Telesis
ModelAT-FS716
CategorySwitch
LanguageEnglish

Related product manuals