EasyManua.ls Logo

Allied A97UH2E - Page 47

Allied A97UH2E
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
508433-01 Issue 2345 Page 47 of 70
6. If unit will be started immediately upon completion of
installation, prime trap per procedure outlined in Unit
Start-Up section.
Condensate line must slope downward away from the
trap to drain. If drain level is above condensate trap,
condensate pump must be used. Condensate drain
line should be routed within the conditioned space to
avoid freezing of condensate and blockage of drain
line. If this is not possible, a heat cable kit may be used
on the condensate trap and line. Heating cable kit is
available from Allied in various lengths; 6 ft. (1.8m) - kit
no. 26K68 and 24 ft. (7.3m) - kit no. 26K69.
Figure 43. Condensate Trap Locations
(Unit shown in upow position with remote trap)
* Piping from furnace must slope down a minimum of
1/4” per ft. toward trap.
Figure 44. Unit with Cooling Coil Using Separate
Drain
Figure 45. Evaporator Coil Using a Separate Drain
* Piping from furnace must slope down a minimum of 1/4” per ft. toward trap.

Related product manuals