EasyManua.ls Logo

Allied A97UH2E - Page 48

Allied A97UH2E
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
508433-01Issue 2345Page 48 of 70
Figure 46. Condensate Trap with Optional Overow
Switch
When combining the furnace and evaporator coil
drains together, the A/C condensate drain outlet must
be vented to relieve pressure in order for the furnace
pressure switch to operate properly.
IMPORTANT
Figure 47. Evaporator Coil Using a Common Drain
Figure 48. Evaporator Coil Using a Common Drain
Piping from furnace and evaporator coil must slope down a minimum 1/4” per ft. toward trap.

Related product manuals