22
H min 100 mm
150
C
A
B
150**
25*
Condensate drain
During the combustion process, the boiler generates condensate that
ows into the drain trap through pipe “A.
e condensate that forms inside the boiler must ow into a suitable
drain from pipe “B.
Danger!
Before commissioning the appliance:
- check correct assembly of the drain trap
- ll the drain trap from the ller cap “C” and check
the correct draining of condensate
If the appliance is used with an empty condensate
drain trap the danger of poisoning subsists following
a ue gas leak.
e top generator of the drain
pipe must not be higher than
the bottom of the pan
TO THE
CONDENSATION
DRAIN
FLOOR OF
THE H.C.U.
FRONT SIDE
e condensate drain pipe outlet is set up towards the connection
side of the ue box manifold, removing the pre-sectioned part on the
cover panel.
* Minimum safety trap enforced by regulation
** Minimum head with boiler operating at maximum power.
Connection between the appliance and the domestic
wastewater disposal system must be carried out in
compliance with the specic regulations of reference.
If you do not want to or are able to create a platform,
it is possible to install the boiler on the oor and set
up the trap at a depth of 100 mm.