EasyManua.ls Logo

Alpha ARES 150 Tec - Page 33

Alpha ARES 150 Tec
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
CH
C
P.
CH
DHW
P. Car.
Stemp.
ACC
Y4
1
2
3
4
1
2
3
1
2
3
4
5
6
Y3
Y2
0
1
2
12 11 10 9 8 7 6 5
4 3 2 1
3
4
5
6
7
8
9
21 3
98 10 11 1 2 1 3 1 4
54 76
Jp2
4
L
anello secondario
Nota:
caldaie
in cascata, fare riferimento al manuale di installa-
Nota:
In caso di installazione con caldaia singola, i col-
scheda BCM interna alla caldaia.
Nota:
nominale complessiva, eventuali valvole di non
-
lazione.
Ares Tec connection 2 in battery controlled by Cascade Manager with Direct Zone plus Production of Domestic Hot Water.
SECONDARY LOOP
Note
For conguration of boiler cascade management para-
meters, see the specic installation manual
Note
For installation with a single boiler, the above connec-
tions will be made on the BCM board inside the boiler
Note
Example diagram, consider the total nominal ow rate,
any non-return valves (not supplied), moreover, the
eciency of the ow switches must be checked at each
ow rate in modulation

Related product manuals