Commissioning P54x/EN CM/La4
MiCOM P543, P544, P545 & P546
CM) 10-1
CM
CONTENTS
(CM) 10-
1. INTRODUCTION 7
2. COMMISSIONING TESTS - RELAY FACILITIES 8
2.1 Opto I/P status 9
2.2 Relay O/P status 9
2.3 Test port status 9
2.4 Red LED status and green LED status 9
2.5 Monitor bits 1 to 8 9
2.6 Test mode 10
2.7 Test pattern 10
2.8 Contact test 10
2.9 Test LEDs 10
2.10 Test auto-reclose 10
2.11 Static test mode 11
2.12 Loopback mode 12
2.13 IM64 test pattern 12
2.14 IM64 test mode 12
2.15 Using a monitor/download port test box 12
3. SETTING FAMILIARIZATION 13
4. EQUIPMENT REQUIRED FOR COMMISSIONING 14
4.1 Minimum equipment required 14
4.2 Optional equipment 14
5. PRODUCT CHECKS 15
5.1 With the relay de-energized 15
5.1.1 Visual inspection 16
5.1.2 Current transformer shorting contacts (optional check) 16
5.1.3 Insulation 18
5.1.4 External wiring 18
5.1.5 Watchdog contacts 18
5.1.6 Auxiliary supply 19
5.2 With the relay energized 19
5.2.1 Watchdog contacts 19
5.2.2 LCD front panel display 19
5.2.3 Date and time 20
5.2.3.1 With an IRIG-B signal 20
5.2.3.2 Without an IRIG-B signal 20
5.2.4 Light emitting diodes (LEDs) 21
5.2.4.1 Testing the alarm and out of service LEDs 21