EasyManua.ls Logo

ANALYTICAL FLOW TECHNOLOGIES DENSITRAK D625 - Meter Maintenance; Meter Cleaning Procedure

Default Icon
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D625 Users Manual
28
D625 Operation
METER MAINTENANCE
It is normal for the D625 to accumulate deposits or corrosion after extended use. These deposits
adversely influence the natural resonant frequency of the meter and should be removed. The
procedure for removing these deposits is fast and easy to perform and in most cases does not
require the meter to be completely removed from the system.
If the meter ever requires a return to the factory for recalibration or repair, the following procedure
must be completed prior to shipment to ANALYTICAL FLOW TECHNOLOGIES.
METER CLEANING PROCEDURE
1. Shutdown flow to the D625 Meter or Shut
down pump (if necessary)
2. Close all bypass valves
3. Alleviate any residual pressure in the system
4. Remove the 5/16-18 x 1 1/4 Socket Head
CAP bolts (4) from the density meter
5. Clean the bolts to remove the old anti-seize
compound.
6. Clean the flange and inspect the flange face
for any debris prior to reassembly
7. Remove the O-Rings
8. Clean the O-Rings and inspect for any
damage prior to reassembly
9. Clean the inside of the resonant tubes:
10. Use a 5/8” 3/4” Diameter Bore Brush with a
mild cleaner/detergent or Isopropyl alcohol
11. Gently brush the interior of each tube with a
back and forth motion
12. DO NOT DAMAGE the resonant tube by
inserting hard metallic objects inside the
resonant tubes
13. Thoroughly rinse the resonant tube interiors
with clean water
14. Repeat Process until rinse water is clear

Table of Contents