English
Important
Those authorised to carry out this opera-
tion must have experience acquired and
certified in the specific sector, must make
the connection to the proper standards,
and must comply with all the relevant regu-
lations and legislation. Once the connec-
tion has been made, before the appliance is
put into operation a general check must be
made to ensure there are no gas leaks.
To make the connection, connect the mains line to
the appliance's connection pipe, fitting a shut-off
tap (A), to allow the gas supply to be cut off when
necessary.
Important
The tap (A), not supplied with the appli-
ance, must be installed in an easily ac-
cessible position and its status (on or
off) must be obvious at a glance.
Important
The gas supply pipe must comply with the
national requirements in force and must
be periodically examined and replaced if
necessary.
GAS CONNECTION
The manufacturer has tested the appliance with its
own mains gas, identified by the sticker applied to
the nameplate.
If the type of gas to be connected is different from
that used for testing, proceed as follows.
1 - Turn off the gas supply tap (A).
2 - Change the burner nozzle (see page 19).
3 - Change the pilot light nozzle (see page 20).
4 - Adjust the minimum settings of the gas control
valves of the burners (see page 17).
5 - If necessary, replace the primary air bushing of
the burner (see page 19).
6 - Remove the sticker from the nameplate and ap-
ply the new one to identify the gas being used.
Important
On completion of the operation, make sure
that there are no gas leaks or malfunctions.
CONVERSION OF GAS SUPPLY
A
A