EasyManua.ls Logo

APC 10000 VA - HARDWIRING INSTRUCTIONS; 220;230;240 V MODELS

APC 10000 VA
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
A
TTACH THE BEZEL TO THE UPS
H
ARDWIRING INSTRUCTIONS
Wiring must be performed by a qualified electrician.
Adhere to all national and local electrical codes.
Install a utility circuit breaker for input wiring, (see tables below).
220/230/240 V MODELS
Input Connections Output Connection (optional)
Single-Phase: Wire to L1, N, and .
Three-Phase: Wire to L1, L2, L3, N, and
.
Wire to L1A, N1, and
.
System Wiring
Number
of
Phases
Voltage
Current
Full Load
(Nominal)
External Input
Circuit Breaker
(Typical)
Wire
Size
(Typical)
Input 1 220/230/240 V 40 A 50 A / 2-pole 10mm
2
Input
3+
Neutral
380/400/415 V
15 A / phase when
online
40 A on L1 in bypass
50 A / 4-pole 10mm
2
SURT8000
Output 1 220/230/240 V 40 A (not required) 10mm
2
Input 1 220/230/240 V 50 A 63 A / 2-pole 16mm
2
Input
3+
Neutral
380/400/415 V
18 A / phase when
online
50 A on L1 in bypass
63 A / 4-pole 16mm
2
SURT10000
Output 1 220/230/240 V 50 A (not required) 16mm
2

Related product manuals