TECHNOPOOL
Dosing systems for swimming pools ENGLISH
ADSP7000570 rev. 2.0 06/08/2021 32/37
Procedure to fill the electrolyte
only for ADELCLJ15
▪ ATTENTION: If the membrane holder cap (11) is removed when the ventilation hole (14) is not open,
the membrane is ruined!!!
▪ Move the transparent ring (10) that covers the ventilation hole (14) downward (above the marking) with a
small screwdriver in order to open the hole.
▪ Loosen the membrane cap (11) from the casing (7) of the measure cell
▪ Move the transparent ring (10) once again into the groove in order to cover the ventilation hole.
▪ Clean the membrane cover (11) and the cover (15 only for ADELCLJ15) under running water and dry
them.
▪ Fill (11) and (15 only for ADELCLJ15) with the electrolyte supplied, making sure not to create air
bubbles.
▪ Only for the ADELCLJ15 electrode: place the vertical probe and carefully push the measure electrode
into the cover (15).
▪ Slowly loosen the membrane holder cap (11) from the casing (5) of the measure cell, for the excess
electrolyte to flow through the open valve.
▪ Tighten the membrane cover securely. The O-Ring causes an initial resistance. When the membrane cover
is tightened completely, the measure cell must not knock against the membrane. This could damage it and
make it unusable.