EasyManua.ls Logo

ARB AC08C - Page 29

ARB AC08C
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15-02-2019 Page 29 of 44 ARB Copyright 2019 3789507
If you have any queries regarding the installation of this product please contact the distributor from whom it was purchased, or alternatively the ARB office in your state.
Head Office ARB Corporation Ltd VIC: 42-44 Garden Street, Kilsyth, Victoria, 3137 Tel: (03) 9761 6622 Fax: (03) 9761 6807
WA:(08) 9244 3553 NSW: (02) 9821 3633 ACT: (02) 6280 7475 SA: (08) 8244 5001 QLD: (07) 3872 3872 NT: (08) 8947 2262 TAS: (03) 6331 4190
4.39) Drill 5.2mm holes through the existing holes in
lower part of the rear tub sealing bracket into the
side wall of the tub with a 10mm drill stop
fitted.
4.40) Apply rust inhibitor to the holes and assemble
two rivets (6609087). Do this on both sides of the
vehicle.
4.41) Drill 5.2mm holes through the exiting holes in
lower part of the rear tub sealing bracket from
the inside of the tub through the centre of the 2
holes in the bracket’s leg. Ensure the lowest
hole aligns for suitable screw access
between the striker plate for the tailgate and
screw in the side wall of the tub.
4.42) Secure the lower portion of the rear tub corner
sealing brackets in place with M5x20 button
head screws from the outside (6151650) with M5
flat washers (4584347) and M5 nylock nuts on
the inside of the tub (6151354).

Related product manuals