EasyManua.ls Logo

Atlas Copco PowerROC T30 E

Atlas Copco PowerROC T30 E
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operator’s instructions
3. Daily checks
28
Before each shift starts an extra and thorough visual safety check should be carried
out in order to detect:
Damage that could give rise to structural weakness or cracks.
Wear that could have the same consequences.
Cracks or fractures in materials or welded joints.
If the drill rig has been subjected to abnormally high stresses, vital load-bearing com-
ponents may have been damaged. From a safety viewpoint, it is therefore especially
important to check the following points (see illustration: Check points).

Table of Contents

Related product manuals