EasyManua.ls Logo

Atlas Copco QAS 60 Pd

Atlas Copco QAS 60 Pd
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 100 -
X1 .......Main power supply (400 Vac)
Terminals L1, L2, L3, N (= neutral) and PE
(= earthing), hidden behind the control panel
door and behind a small transparent door.
N14 ..... Insulation monitoring relay
Checks the insulation resistance and
activates Q1 when the insulation resistance
is too low.
S2 .......Emergency stop button
Push the button to stop the generator in case
of an emergency. When the button is
pressed, it must be unlocked, by turning it
anti-clockwise, before the generator can be
restarted. The emergency stop button can be
secured in the locked position with the key,
to avoid unauthorized use.
9.3.13 “Electricité de France” (EDF)
When the EDF-option is installed, the unit operates as
a standard unit when the neutral and the PE terminals
are connected to each other (see figure below). In this
case, an earth leakage at the side of the generator or at
the side of the load will switch off the circuit breaker.
When EDF-option is installed, the unit operates as
EDF-unit when the earthing, the PE and the PE EDF
terminals are connected to each other (see figure
below). In this case, an earth leakage at the side of the
generator will switch off the circuit breaker. An earth
leakage at the side of the load will not switch off the
circuit breaker.
L1 L2 L3
N PE EDF
PE
Changing the operation mode from
standard unit to EDF-unit or vice
versa has to be carried out by a
qualified person from “Electricité
de France”.
L1 L2 L3
N PE EDF
PE
!

Table of Contents

Other manuals for Atlas Copco QAS 60 Pd

Related product manuals