EasyManua.ls Logo

Atlas Copco TEX 140PS

Atlas Copco TEX 140PS
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
TEX 140PS 150PE 180PS 190PE 220PS 230PE 270PS 280PE
© 2007 Atlas Copco Construction Tools AB
|
No. 9800 0800 01
|
2007-10-01
Overhaul instructions
Tool chuck
1
30
tons
2
A
The lock wire (A) will be sheared off in two halves.
Clear the inside of the cylinder from the remaining
half of the lock wire.
Assembly
Before re-assembly do the following:
Properly clean all parts of the machine.
Oil all parts of the machine.
Replace all O-rings.
Replace all worn or damaged parts.
Tool chuck
Rotation of tool chuck
ISO
point to flat
US
flat to flat
Ź
Ź
Ź
Ź

Related product manuals