EasyManua.ls Logo

Atlas LR10 - Power Requirements for Installation; Installation Steps

Atlas LR10
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
2
ǃ
Power Requirement
Power source must be over 2.2kw,source cable size must be over 2.5mm² and in good condition
of contacting with floor.
III. STEPS OF INSTALLATION
A. Check the Parts Before Assembly & make sure all the parts are completed.
1ǃ Packaged lift, Parts box, Power Unit and Power Unit Stand. Move aside the parts, Open the
outer packing and check the parts according to the shipment parts list.
(See Fig. 3).
2ǃOpen the parts boxˈcheck the parts according to the part list (See Fig. 4).
Fig. 3
Fig.4

Related product manuals