Power Requirement
Power source must be over 2.2kw,source cable size must be over 2.5mm² and in good condition
of contacting with floor.
III. STEPS OF INSTALLATION
A. Check the Parts Before Assembly & make sure all the parts are completed.
1ǃ Packaged lift, Parts box, Power Unit and Power Unit Stand. Move aside the parts, Open the
outer packing and check the parts according to the shipment parts list.
(See Fig. 3).
2ǃOpen the parts boxˈcheck the parts according to the part list (See Fig. 4).
Fig. 3
Fig.4