EasyManuals Logo

AUMA SQEx 05.2 Operation Instructions

AUMA SQEx 05.2
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #65 background imageLoading...
Page #65 background image
9.9. Switch compartment: close
Danger of corrosion due to damage to paint finish!
Touch up damage to paint finish after work on the device.
1. Clean sealing faces of housing and cover.
2. Preserve joint surfaces with an acid-free corrosion protection agent.
3. Check whether O-ring [3] is in good condition, replace if damaged.
4. Apply a thin film of non-acidic grease (e.g. petroleum jelly) to the O-ring and
insert it correctly.
Figure 71:
Flameproof enclosure, danger of explosion!
Risk of death or serious injury.
Handle cover and housing parts with care.
Joint surfaces must not be damaged or soiled in any way.
Do not jam cover during fitting.
5. Place cover [1] on switch compartment.
6. Fasten screws [2] evenly crosswise.
65
SQEx 05.2 SQEx 14.2 / SQREx 05.2 SQREx 14.2 Control unit - electromechanical
ACExC 01.2 Intrusive Commissioning (basic settings)

Table of Contents

Other manuals for AUMA SQEx 05.2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AUMA SQEx 05.2 and is the answer not in the manual?

AUMA SQEx 05.2 Specifications

General IconGeneral
BrandAUMA
ModelSQEx 05.2
CategoryController
LanguageEnglish

Related product manuals