7
What You Should Know
AVL 415SE Smoke Meter — Maintenance Guide
1 What You Should Know
1.1 Safety Instructions
This documentation contains important Warnings and Safety Precautions
which should be observed by the user. Only by careful observance of these
requirements and safety precautions, a smooth operation can be guaranteed.
1.2 About the AVL 415SE Smoke Meter
Minimize your system downtimes by means of proactive measures. Our compe-
tent service engineers will carry out inspections and maintenance with technical
professionalism and cost efficiency in mind. Using original spare parts guaran-
tees high system reliability. AVL preventive maintenance assures the highest
possible availability of the system and devices.
Your benefits at a glance:
Best availability of equipment due to minimized down times
Guaranteed service quality through certified engineers
Easy budgeting due to transparent maintenance costs
Maintenance plans optimized for the used equipment and its applications
A typical preventive maintenance procedure comprises the following steps:
Visual check
Performance checks
Cleaning
Replacing wear parts
Calibration and re-adjustment
Calibration protocols
Failure diagnostics
Recommendation for repair
Required manpower:
The required time for an annual maintenance by an AVL Service Engineer is
6hours.
Obviously, this time might depend of the usage and the environment conditions
of the device.
The frequency we recommend in this document is based on normal operating
hours (8 hours/working day).
Information
This manual refers to the maintenance of a Smoke Meter 415SE.
Handling and actions are mainly the same as for the 415S Smoke Meter, but the
spare parts can be different.