EasyManua.ls Logo

Ballantine 3207 - Care and Maintenance; General Instrument Care; Fuse Replacement Guide

Ballantine 3207
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BALLANTINE LABORATORIES, Inc. MODEL 3207 MICRO-OHM METER
28
SECTION 5
CARE AND MAINTENANCE
5.1 Care and Maintenance:
Your Instrument is a precise electronic device; do not tamper with the circuitry. To
prevent electric shock hazard, turn OFF the power and disconnect the probes or
connectors from the mains before removing the case, if needed.
5.2 Replacing the Fuse:
Caution: For continued protection against fire or other hazard, replace only with a fuse
of the specified voltage and current ratings.
Power Line Fuse
Line Voltage Fuse
115V, 60Hz 250mA
115V, 60Hz
500mA
(for the Option –05)
Input Protection Fuse
Voltage Rating Fuse
115V 1A
Follow these steps to replace the Fuse.
1. Switch OFF the Instrument.
2. Disconnect the Test Leads and Mains Cord.
3. Remove the defective Fuse by taking off the fuse holder.
4. Install a new Fuse in the Fuse holder.

Related product manuals