iMX113 BD Pyxis ™ ES Refrigerator Tower Operation Manual
360395/E 9
3 Operating the i.C
3
Monitoring System
3.1 Initial Power-up
1. Plug power cord into grounded outlet that meets electrical requirements on the product specication label.
2. Switch AC ON/OFF switch ON.
3. Switch back-up battery key switch ON. The Power-up screen is displayed followed by the System Boot screen.
Note
The i.C
3
will take approximately 2-5 minutes to start.
Power-up screen System Boot screen
The Home screen is displayed when the i.C
3
is powered on. This screen is the primary screen that will appear on the i.C
3
display
during normal operation and when a user is not interfacing directly with the i.C
3
. The i.C
3
Home screen displays temperature, door
lock status and alarm information, and provides buttons for accessing other functions of the i.C