Table of contents
3.3.1 Pin assignment of the connector 17
3.3.2 Cable Cross Sections 17
3.3.3 Check voltage rating and connect 17
3.3.4 Configuration for shutting down the PC 18
3.3.5 PC_ON and Power Status functions 18
3.4 Connecting the Industrial PC 19
3.4.1 Connecting cables 19
3.4.2 Check voltage rating and connect 19
3.4.3 Earthing measures 19
4 Operating Instructions 20
4.1 Switching the Industrial PC on and off 20
4.1.1 Switch on 20
4.1.2 Shutting down and switching off 20
4.1.3 First switching on and driver installation 20
4.2 Servicing and maintenance 21
4.2.1 Cleaning of the Industrial PC 21
4.2.2 Maintenance 21
4.2.3 Replacing the Battery on the Motherboard 21
4.3 Emergency procedures 21
4.4 Shutting down 21
4.4.1 Disposal 21
5 Troubleshooting 22
6 Assembly dimensions 23
7 Technical Data 25
8 Appendix 26
8.1 Beckhoff Support and Service 26
8.1.1 Beckhoff branches and partner companies 26
8.1.2 Beckhoff company headquarters 26
8.2 Approvals for USA and Canada 27
8.3 FCC Approvals for the United States of America 27
8.4 FCC Approval for Canada 27
2 C6030-0060