EasyManua.ls Logo

Belling G755 - Page 8

Belling G755
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Operational Checks After installation check for gas soundness.
Assemble burner caps and rings; fit pan supports in position.
Turn on the gas supply and check for soundness at the hotplate injector.
Light two burners and check that the pressure is correct.
Before you cook for the first time, we recommend that you light each burner
in turn to burn off any odours remaining from manufacture. Simply operate
the grill on maximum for a few minutes and the oven(s) for approximately 30
minutes. Ensure that the room is well ventilated (e.g. open a window or use
an extractor fan) and that persons who may be sensitive to the odour avoid
any fumes. It is suggested that any pets be removed from the room until the
smell has ceased.
Instruct the user on the operation of the cooker.

Related product manuals