EasyManua.ls Logo

BenchMark Wireline AM5K Series User Manual

BenchMark Wireline AM5K Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
benchmarkwireline.com
P. O. BOX 850
Fax: 281.342.4848
Phone: 281.342.6415
Simonton,Texas 77476
36220 FM 1093
AM5K User Manual Rev Q Oct 2007 Page 1 of 44
AM5K COMBINED DEPTH/TENSION
MEASUREMENT DEVICE
ATEX ZONE 2 CE
HALLIBURTON ENERGY SERVICES CONFIGURATIONS
AM5KA512 one encoder, no MMD (CH) SAP # 101321352
AM5KA507 dual encoders, MMD (OH) Zone 2 SAP # 101281049
AM5KA529 dual encoders, no MMD (CH) Zone 2 SAP # 101286954
CONTENTS
1.0 GENERAL
2.0 SYSTEM DESCRIPTION
3.0 OPERATION
4.0 MAINTENANCE AND REPAIR
5.0 RECOMMENDED SPARE PARTS
6.0 DRAWINGS AND PARTS LISTS
6.1 Measure Head Assembly
6.2 Magnetic Mark Detector
6.3 Load Pin
6.4 Encoder
6.5 Backup Odometer
7.0 CERTIFICATION DOCUMENTS
Question and Answer IconNeed help?

Do you have a question about the BenchMark Wireline AM5K Series and is the answer not in the manual?

BenchMark Wireline AM5K Series Specifications

General IconGeneral
BrandBenchMark Wireline
ModelAM5K Series
CategoryMeasuring Instruments
LanguageEnglish

Summary

AM5K COMBINED DEPTH/TENSION MEASUREMENT DEVICE

1.0 GENERAL

2.0 SYSTEM DESCRIPTION

DEPTH MEASUREMENT

Describes how the AM5K measures wireline depth using measuring wheels and encoders.

TENSION MEASUREMENT

Explains the process of measuring line tension using an electronic load axle and wheels.

3.0 OPERATION

3.1 SPOOLING ARM INSTALLATION – OVERHEAD SPOOLING ARM

Instructions for mounting the AM5K measuring head onto an overhead spooling arm.

3.2 CABLE INSTALLATION

Step-by-step guide for installing or removing wireline cable from the measuring head.

3.6 SYSTEM OPERATION

Steps for operating the AM5K system, including calibration and initial setup checks.

4.0 MAINTENANCE AND REPAIR

4.1 PRE-JOB CHECK

Essential checks to perform before each use of the AM5K device to ensure proper function.

4.2 POST-JOB MAINTENANCE

Procedures for cleaning and maintaining the device after job completion to prevent residue buildup.

4.3 MONTHLY MAINTENANCE

Routine checks and lubrication requirements for the AM5K device on a monthly basis.