Do you have a question about the Bender W1-35/8000 and is the answer not in the manual?
The BENDER W1-35/8000 ... WS20x30/8000 series of measuring current transformers (CTs) are designed for use with the EDS473/474 insulation fault location systems in IT systems. These CTs are crucial for measuring the test current generated by the PGH473/474 test device, enabling effective fault detection and location.
The measuring current transformers are integral components of an insulation fault location system. They are connected to the EDS473-12 or EDS474-12 evaluator via two wires, each with a minimum cross-section of 0.75 mm². The maximum permissible cable length for this connection is 40 meters. The primary function of these CTs is to detect and measure the test current generated by the PGH473/474 test device, which is injected into the IT system to identify insulation faults. All live conductors of the system under monitoring, with the exception of the protective earth (PE) conductor, must be routed through the measuring current transformer. The PE conductor must never be passed through the CT during residual current measurements. For optimal performance, conductors should be passed through the CT symmetrically and at a right angle. Unused measuring current transformers must be short-circuited by connecting their S1(k) and S2(I) contacts to PE. The S2(I) connections of all measuring current transformers should always be connected to a common terminal strip, with a maximum cable length of 25 cm between this strip and the EDS47x-12 evaluator.
The W1-35/8000 ... WS20x30/8000 series offers various form factors to suit different installation requirements:
All CTs consist of a special magnetic core and a winding enclosed within a plastic housing, ensuring durability and protection. Installation should only be performed by qualified electricians, adhering to current safety regulations and the specific instructions provided in the product documentation. Prior to installation and any work on the connecting cables, it is crucial to ensure that the mains power is disconnected to prevent electric shock and damage to the equipment. The CTs can be fixed directly to cables using cable ties or screw-mounted via integrated lugs. It is important not to connect the CT fixing parts with magnetically closed circuits and to avoid installation near strong magnetic fields, which could interfere with accurate measurements.
The device manual emphasizes the importance of proper installation and initial checks to ensure reliable operation. Before commissioning, the connection of the measuring current transformer must be thoroughly checked. If an EDS473 or EDS474 evaluator immediately signals a fault after commissioning, it is recommended to check the operating circuit and the connected loads upstream of the devices for insulation faults. A functional test using a genuine earth fault, possibly via a suitable resistance, is recommended to verify the system's performance. The robust design and adherence to international standards (DIN EN 60044-1:2001-11) ensure long-term reliability and minimal maintenance requirements under normal operating conditions. The product is designed for continuous operation and can be installed in any position.
| Brand | Bender |
|---|---|
| Model | W1-35/8000 |
| Category | Measuring Instruments |
| Language | English |












Loading...