EasyManua.ls Logo

BendPak Autostacker PL-6SR - Page 40

BendPak Autostacker PL-6SR
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Autostacker™ Parking Lift 40 P/N 5900002Rev. D August 2019
Final Checklist
Make sure these things have been done before using your lift:
Review the Installation Checklist to make sure all steps have been performed.
Make sure the Power Unit is getting power from the power source.
Check the Power Unit’s Hydraulic Fluid reservoir; it must be full of approved Hydraulic Fluid or
automatic transmission fluid. You can harm the motor by running it without enough fluid.
Check the Hydraulic System for leaks.
Check to see that all Anchor Bolts are properly tightened.
Make sure that all Safety Locks are cleared and free.
Make sure a copy of the Installation and Operation Manual is left with the equipment, so that it is
available to all operators, and make sure all labels are visible.
Raise the Autostacker to each of the six Safety Locks and measure the space between the ground
and the bottom of the Drive-Up Ramp. Check these values against the values shown in Raising a
Vehicle. These are the actual values that you should use to determine what Vehicles you want to
put where.
Perform an operational test of the Lift with a typical Vehicle.
During the operational test, observe all operating components and check for proper installation and
operation. Do not raise any additional vehicles until a thorough operational check has been
performed with a typical Vehicle.
If the Autostacker fails the operational test, take it out of service, then consult Troubleshooting
to begin addressing the problem.

Related product manuals