EasyManua.ls Logo

BendPak XP Series - Step Eleven: Installing Overhead Micro Switch; Step Twelve: Power Unit Installation and Start-Up

BendPak XP Series
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IMPORTANT POWER-UNIT
INSTALLATION NOTES
DO NOT run power unit with no oil. Damage to
pump can occur.
The power unit must be kept dry. Damage to power
unit caused by water or other liquids such as detergents,
acid etc., is not covered under warranty.
Improper electrical hook-up can damage motor and
will not be covered under warranty.
Motor can not run on 50HZ without a physical
change in motor.
Use a separate breaker for each power unit.
Protect each circuit with time delay fuse or circuit
breaker.
For 208-230 volt, single phase, use a 25 amp fuse.
For 208-230 volt, three phase, use a 20 amp fuse.
For 380-440 volt, three phase, use a 15 amp fuse.
installation and adjustment. DO NOT attempt to
raise vehicle until a thorough operation check
has been completed.
15
STEP ELEVEN
( Installing Overhead MICRO SWITCH. )
1. Install the overhead Micro Switch as shown
below. Be sure to keep wire clear of moving
parts. WIRING MUST BE PERFORMED BY A
CERTIFIED ELECTRICIAN. Fig 23 & 24
STEP TWELVE
( Power Unit Installation and Start-Up. )
1. The standard power unit for your lift is 220 volt,
60HZ, single phase. All wiring must be performed
by a certified electrician only. SEE WIRING
INSTRUCTIONS AFFIXED TO MOTOR FOR
PROPER WIRING INSTRUCTIONS.
Fig 24
Fig 23

Related product manuals