EasyManuals Logo

BendPak XPR-10XLS User Manual

Default Icon
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
XPR-10 Series Two-Post Lifts 22 P/N 5900951 — Rev. D — May 2019
The following procedure puts the two Equalizing Cables into place at the bottom of the Post; it is not a
full install of the Equalizing Cables.
To put the Equalizing Cables into position:
1. Put both Posts either flat on the ground or mostly on the ground with their tops elevated on a
sawhorse or similar.
The
insides
of the Posts need to be accessible, facing up.
2. Slide the Lift Heads away from the bottoms of both Posts by at least 24 inches / 610 mm, to give
yourself some space to work.
Not necessarily to scale. Not all components shown. Top view looking at inside of Post. Equalizing
Cables not yet in place.

Other manuals for BendPak XPR-10XLS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-10XLS and is the answer not in the manual?

BendPak XPR-10XLS Specifications

General IconGeneral
BrandBendPak
ModelXPR-10XLS
CategoryLifting Systems
LanguageEnglish

Related product manuals