EasyManua.ls Logo

BendPak XPR-10AS-168-LP - User Manual

Default Icon
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
INSTALLATION AND OPERATION MANUAL
RECEIVING
The shipment should be thoroughly inspected as soon as it
is received. The signed Bill of Lading is acknowledgement
by the shipping carrier as receipt of this product as listed
in your invoice as being in a good condition of shipment. If
any of these goods listed on this Bill of Lading are missing
or damaged, do not accept goods until the shipping carrier
makes a notation on the freight bill of the missing or
damaged goods. Do this for your own protection.
BE SAFE
Your new lift was designed and built with safety in mind.
However, your overall safety can be increased with proper
training and thoughtful operation on the part of the operator.
DO NOT operate or repair this equipment without reading
this manual and the important safety instructions shown
inside. Keep this operation manual near the lift at all times.
Make sure that ALL USERS read and understand this
manual.
1645 Lemonwood Dr.
Santa Paula, CA. 93060, USA
Toll Free 1-800-253-2363
Tel: 1-805-933-9970
Fax: 1-805-933-9160
www.bendpak.com
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
PLEASE READ THE ENTIRE CONTENTS OF THIS MANUAL PRIOR TO
INSTALLATION AND OPERATION. BY PROCEEDING WITH LIFT INSTALLATION
AND OPERATION YOU AGREE THAT YOU FULLY UNDERSTAND THE
FULL CONTENTS OF THIS MANUAL. FORWARD THIS MANUAL TO ALL
OPERATORS. FAILURE TO OPERATE THIS EQUIPMENT AS DIRECTED MAY
CAUSE INJURY OR DEATH.
MAN REV A 09-06-2016
P/N 5900951
10,000 LB /4536 KG CAPACITY
SURFACE MOUNTED TWO-POST LIFTS
MODELS:
XPR-10S
XPR-10S-LP
XPR-10S-168
XPR-10S-168-LP
XPR-10TS
XPR-10TS-168
XPR-10AS
XPR-10AS-LP
XPR-10AS-168
XPR-10AS-168-LP
400V 50Hz SUPPLY DETAILS ARE
INCLUDED WITH ELECTRICAL
CONTROL BOX. DISREGARD SUPPLY
WIRING DETAILS IN THIS MANUAL
EUROPEAN USERS
ORIGINAL INSTRUCTIONS IN
ENGLISH LANGUAGE
Keep this operation manual near the
machine at all times. Make sure that
ALL USERS read this manual.
Symmetrical
model shown
.

Other manuals for BendPak XPR-10AS-168-LP

Question and Answer IconNeed help?

Do you have a question about the BendPak XPR-10AS-168-LP and is the answer not in the manual?

Summary

Safety Warnings and Instructions

General Warnings

General safety warnings and instructions for lift operation.

Read First Notice

Important notice to read all dangers, warnings, and cautions before operating.

Be Safe Guidelines

Important Notices and Responsibilities

Installer and Operator Agreement

Introduction and Safety Instructions

Important Safety Instructions

Comprehensive safety instructions to be read before operation.

Step 3: Post Preparation

Step 4: Site Layout

Step 5: Installing the Power Side Post

Step 6: Installing the Off Side Post

Step 7: Mounting the Overhead Assembly

Step 8: Mounting the Hydraulic Power Unit

Step 9: Installing Safeties and Safety Cable

Step 10: Installing Hydraulic Lines

Step 11: Routing the Equalizer Cables

Step 12: Installing Overhead Microswitch

Step 13: Power Unit Hose Assembly and Safety Cover

Step 14: Installing the Lift Arms

Important Leveling Instructions

Carriage-Stop Bolt Installation

Important Power-Unit Installation Notes

Step 15: Power Unit Connection

Step 16: Lift Start Up and Final Adjustments

Post-Installation Check-Off

Step 18: Bleeding the Cylinders

Step 19: Operation Instructions

Owner;Employer Responsibilities

Responsibilities of owners and employers for lift safety and training.

Lift Operation Safety

Daily checks and general safety rules for operating the lift.

Lift Operation Safety (Continued)

Required Monthly Maintenance

Wire Rope Inspection and Maintenance

Safe Lift Operation

Lift Operation; Safety

Key operational and safety considerations for using the lift.

Danger Warnings

Troubleshooting: Lift Will Not Raise

Troubleshooting: Motor Issues

Troubleshooting: Slow Lowering

Troubleshooting: Lift Will Not Raise Loaded

Troubleshooting: Lift Will Not Stay Up

Torque Recommendations

Summary

Safety Warnings and Instructions

General Warnings

General safety warnings and instructions for lift operation.

Read First Notice

Important notice to read all dangers, warnings, and cautions before operating.

Be Safe Guidelines

Important Notices and Responsibilities

Installer and Operator Agreement

Introduction and Safety Instructions

Important Safety Instructions

Comprehensive safety instructions to be read before operation.

Step 3: Post Preparation

Step 4: Site Layout

Step 5: Installing the Power Side Post

Step 6: Installing the Off Side Post

Step 7: Mounting the Overhead Assembly

Step 8: Mounting the Hydraulic Power Unit

Step 9: Installing Safeties and Safety Cable

Step 10: Installing Hydraulic Lines

Step 11: Routing the Equalizer Cables

Step 12: Installing Overhead Microswitch

Step 13: Power Unit Hose Assembly and Safety Cover

Step 14: Installing the Lift Arms

Important Leveling Instructions

Carriage-Stop Bolt Installation

Important Power-Unit Installation Notes

Step 15: Power Unit Connection

Step 16: Lift Start Up and Final Adjustments

Post-Installation Check-Off

Step 18: Bleeding the Cylinders

Step 19: Operation Instructions

Owner;Employer Responsibilities

Responsibilities of owners and employers for lift safety and training.

Lift Operation Safety

Daily checks and general safety rules for operating the lift.

Lift Operation Safety (Continued)

Required Monthly Maintenance

Wire Rope Inspection and Maintenance

Safe Lift Operation

Lift Operation; Safety

Key operational and safety considerations for using the lift.

Danger Warnings

Troubleshooting: Lift Will Not Raise

Troubleshooting: Motor Issues

Troubleshooting: Slow Lowering

Troubleshooting: Lift Will Not Raise Loaded

Troubleshooting: Lift Will Not Stay Up

Torque Recommendations

BendPak XPR-10AS-168-LP Specifications

General IconGeneral
BrandBendPak
ModelXPR-10AS-168-LP
CategoryLifting Systems
LanguageEnglish

Related product manuals