25
• OPEN valves S3 and S4.
• PresstheLOWERbuttonuntilbothrampslowertothe
oor.
• CLOSE valves S3 and S4.
• OPEN MAIN valve
Lift will not raise completely
Lower the lift until it reaches oor level.
• CLOSE MAIN valve.
• OPEN valves S3 and S4.
• Press the RAISE button until lift approximately 24”
• CLOSE valves S3 and S4.
• OPEN MAIN valve
• Press the LOWER button until the ramps are lowered
to the oor.
• CLose the MAIN valve
• Open S3 and S4 valves
• Press the RAISE Button until the lift approximately 24”
above the oor.
•
• Close the S3 and S4 Valves
• Open the MAIN Valve
• Press the LOWER button until the ramps are lowered
to the oor.
• Repeat until the ramps cannot be lowered to the oor.
• Close the MAIN valve.
• Open S3 and S4 valves.
• Press the LOWER button until the ramps are lowered
to the oor.
• Close the S3 and S4 valves.
• Open the main valve.
After Bleeding and Leveling the Baseplates have
moved out of position
• Reposition the Baseplates to the correct posi-
tions before installing anchor bolts.
• Ifacomponenthasbeenreplaced.Bleeding
and Leveling must be repeated with the hydraulic sys-
tem partially lled with uid.
• Callcustomerserviceimmediately.Thecom-
plexity of different situations requires Bendpak experts
to assist you in correctly bringing your lift back to
working condition.
OVER PRESSURE:
NOTE: Avoid pressing the raise button if the lift is in the
maximum raised position. The sound of the motor will
change in this situation. If the lift has been raised and
the “raise” button has continued to be pressed, press the
“lower” button for 1 second to relive system pressure.