EasyManua.ls Logo

BenQ MS500 - Page 65

BenQ MS500
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
65
Fig. 1-7 Fig. 1-8
2. Assembly FM Module:
2.1 Place FM on “HLD FM” surface(Fig. 2-1) and use “Clip FM” to fix FM(Fig. 2-2).
Fig. 2-1 Fig. 2-2
3. Assembly HSG ILL Module:
3.1 CM Assembly
I. Insert “Clip CM Side” first, and then place “Clip Front CM” to fixed-shaft of ILL SUB before
locking screw (Fig. 3-1, Fig. 3-2).
II. Assemble Mylar SUB HSG to HSG ILL well (Fig. 3-3).
III. Assemble CM to HSG ILL and to make CM contact three datum on the HSG ILL well (Fig.
3-3).
IV. Assemble” MYLAR CM” to the CMD firstly, “CLIP TOP CM”(with forceps) to the “HSG ILL”
(Fig. 3-4,).
V. To check and make sure “CLIP of CM” hooks the HSG ILL very Well (Fig. 3-5).
VI. Paste “Sponge tube AL” on cannelure of” HSG ILL” (Fig. 3-6).
3.2 FM Module Assembly
I. FM Module must be placed to fixed shaft and on the datum surface of “ILL SUB” and then
lock with screw well(Fig. 3-7).
Push on the left corner until lock
the screw well
Lock the screw well
Touch the side
surface
Clip FM hook
the punch points