components. If necessary, test filter and the fixed bolt on the front panel, these bolts should not
be too tight. If you need to check the surface of the air filter, you can loosen bolts fixed well
wind network and take it out carefully from the front.
7) Check if the work place stable.
8) If the safety cabinet is equipped with water tap and gas tap, on the side wall is 1/2 inch threaded
pipe joint; Connected to the building or other connection should fit this size.
9) Install HEPA exhaust protective device on the exhaust HEPA filters: put the protective device
on the opening place of the filter and fix it with nut.
Note: do not put hand into the exhaust air filter at any case.
10) Fix drain valve on the bottom floor, connect the drain valve, and check the drain valve in the
closed position - in parallel with the ground position, as shown in figure 7.
11) The top of the device is equipped with HEPA exhaust protective device, if equipment requires
there is an external exhaust system (applied to the poisonous and harmful gas or steam).
Note: there is at least 300 mm clean space between the lab ceiling and the exhaust HEPA filter. If
the exhaust HEPA filter is blocked, there will be no enough air flow into the operation area.When
the exhaust HEPA filter at the top of the clean room is less than 406 mm, you must test the wind
speed at spot.
12) Install UV lamp.
13) Installation of the main components in Picture 4.5.6.
a. Installation of base stand
,
Refer to picture 4 install base.
Picture4
1.Right bracket
2.Back connection plate, use six inside hex bolts M10 x 20 to fix with right and left bracket
3. Inside hex bolts M10 x 20, six pcs
4. Left bracket
b. Connect main body and base