Lay the air ducts by securing them to the surface with
mounting tape.
4
Put two seals on each end of the air ducts from the
flange connection side.
Put two seals on the plug.
5
Insert the air ducts with the sealing rings into the
flanges.
Secure the ducts in the flanges on both sides using the
universal locks (included in the connector delivery set).
6
Close the unused flanges with plugs. Secure the plugs
in the flanges on both sides using the universal locks (included
in the connector delivery set).