EasyManua.ls Logo

BLAUBERG BlauFast - Page 29

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
blaubergventilatoren.de
4
Lay the air ducts by securing them to the surface with
mounting tape.
5
Place two seals on each duct end on the flange
connection side.
WARNING! Before the ducts are covered with concrete, make sure to provide extra sealing for the joint between the
duct and the ange and the joint between the ange and the plug using a cold shrink tape.
6
Insert the ducts with the sealing rings into the
flanges.
7
Close the unused flanges with plugs.
8
Secure the duct and the plugs using the lock rings.

Related product manuals