EasyManua.ls Logo

Bluetti B500 - Inverter Status Details

Bluetti B500
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Inverter Status
It shows how the EP600 ESS is operating.
Shutdown:
The AC switch is turned off or forced off due to a serious failure.
Off-grid operation:
The AC switch is on, but the system is running off the grid.
On-grid operation:
The AC switch is on and the system is running on the grid. However, it doesn't charge from or feed back
to the grid. The grid can bypass the EP600 inverter and power your loads directly.
On-grid charging:
The AC switch is on and the system is running on the grid. And the system charges from the grid.
On-grid discharging:
The AC switch is on and the system is running on the grid. And the system feeds back into the grid.
Note: When the EP600 ESS is in operation, you can charge it with solar energy anyway.
5. PV
PV (Photovoltaic) charging. To show how much power the
EP600 is drawing from your rooftop solar or solar panel(s).
6. Grid
Charging from or feeding into the grid. To show how much
power the EP600 is drawing from or feeding back into the grid.
7. AC
AC output. This shows how much power the EP600 is supplying
to your devices.
8. Inverter Status 9. Battery Pack 10. Power Statistics
Refer to the following sections.
4. 8%
The remaining battery level.
1.
To check current alarm(s) and alarm history.
2.
To check and change settings.
3.
Bluetooth/WiFi connection successful.
12