13
D
Initial set-up of MINIPRESS
!
D8
Connection to compressed air system
1. Connection of air supply
Warning:
The drilling unit (F23)
moves upward when the
steps below are carried out!
• Attach a 1/4" I.D. flexible hose onto
barbed hose fitting (D8) of the
machine.
Important:
A „quick disconnect“ fitting
must be installed on the
compressed air hose, no
more than 10“ (3 m) away
from the machine.
2. Setting the working pressure
• The working pressure is 6 bar
(80 - 100 psi). If the machine is
operated either below or above the
recommended air pressure, could
result in personal injury or damage
to the machine.
• The compressed air supplied to the
machine must be oil free and dry.
%$0,1,35(66)$,G1US $0