EasyManua.ls Logo

Bomag BPR 35/60 D - Page 46

Bomag BPR 35/60 D
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance every 6 months
BOMAG
46
BPR 35/40 D BPR 35/60 D
Fig. 51
l Loosen the rear nuts (Fig. 51) on both sides for
afewturns.
l Unscrew the front nuts on both sides.
!
Danger
Danger of squashing!
Fig. 52
l Raise the engine carrier plate at the front and
support it (Fig. 52).
Fig. 53
l Unscrew the screws (Fig. 53) and take off the
cover.
l Install a new V-belt, assemble the cover, fas-
ten the engine carrier plate and tension the V-
belt as described above.
l Assemble the V-belt guard.
!
Caution
Check the V-belt tension again after a running
time of approx. 25 operating hours, retighten if
necessary.
Go to Discount-Equipment.com to order your parts

Related product manuals