Chapter 4: Maintenance and Examination
Frequent examination and maintenance is not required for the inverter.
To maintain appropriate reliability, please proceed with following periodical examination. Remember
to turn off power supply and wait till the Power LED goes off before proceed. (Due to the large
amount of remaining charges in the internal capacitors.)
(1) Clean out internal dust and dirt.
(2) Check out mounting screws on every terminal and parts. Tighten loose screws.
(3) Dielectric strength test
(a) Remove all conducting wires between Drive and outside world. Power must be turned OFF.
(b) The dielectric strength test inside Drive should be carried out only for T-VERTER major circuitry.
Use DC 500V: high resistance meter. Measured resistance should be higher than 100M ohm.
CAUTION: Do not perform dielectric strength test to the control circuit.
Connection for dielectric strength test
Input power source
DC-500V
high-resistance
meter
Grounding terminal
Motor
L1 (R) T1 (U)
L2 (S) Drive T2 (V)
T3 (W)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BONFIGLIOLI Vectron Syn10 S115 01 and is the answer not in the manual?

BONFIGLIOLI Vectron Syn10 S115 01 Specifications

General IconGeneral
CategoryController
ModelVectron Syn10 S115 01
Frequency range50/60 Hz
Protection classIP20
Communication interfaceCANopen
Relative humidity< 95 % (non-condensing)

Related product manuals