14/40 Assembly
Bosch Rexroth AG, MIT: BS 1/…, 3 842 563 815/2021-11
7 Assembly
7.1 Unpacking
Lift the product out of its packaging.
Dispose of the packaging material in accordance with the applicable regulations
in your country.
7.2 Installation requirements
During installation, be sure to maintain the ambient conditions specified in the
technical data (seepage36).
7.2.1 Installation position
Install the product level and plumb, at right angles, and axially parallel.
Thisensures proper functioning and prevents premature wear.
7.3 Required tools
• Hex wrench (open-ended spanner) SW8, SW10, SW13, SW19, SW24.
• Hex socket wrenches SW3, SW4, SW5.
• Hexagon socket wrench (Torx™) T30, T50
• Phillips screwdriver PH2
• Spirit level
• Combination pliers
• Flat smooth file
7.4 Required accessories
• Section supports for holding up the belt section.
Please note: Support the belt section in the immediate vicinity of the drive and
return unit. Max. distance between two leg sets: 2000 mm.
–for BS1, BS 1/T, BS 1/M, BS 1/S
SZ 1, 3842996336 or
SZ 1/L, 3842996335
Mounting kit, 3 842 523 431
• For fastening the leg sets on the ground, you need the following for each
connection:
–1x foundation bracket, 3842146815
–1x dowel, 3842526560
–2x T-bolts, 3842528718
–2x flange nuts, 3842345081
• Connection kit for transverse conveying, for utilization of the belt section in
lateral transverse conveying (drive head-at-section).
–BS1/..., 3842525110
• Connection kit for longitudinal conveyor (drive head at return unit)
–BS1/..., 3842525110