H Service checklist
The Service Checklist places responsibilities on both
manufacturers and installers. The purpose is to ensure
that customers are provided with the correct
equipment for their needs, that it is installed,
commissioned and serviced in accordance with the
manufacturer's instructions by authorised persons
and meets the requirements of the appropriate
building regulations. The service checklist can be used
to demonstrate compliance with building regulations
and should be provided to the customer for future
reference.
H Combustion and corrosive materials
• Do not store or use any flammable materials
(thinners, paints etc.) inside or within the vicinity of
the appliance.
Chemically aggressive substances can corrode the
appliance and invalidate any warranty.
• Do not spray aerosols in the vicinity of this
appliance while it is in operation.
Clearance space around the appliance.
• Do not restrict this space with the additions of
cupboards, shelves etc. next to or around the
appliance.
• Do not store any combustible materials on or next to
the appliance, such as clothes, towels, paper or
plastic bags.
• DO NOT PLACE ARTICLES ON OR AGAINST THIS
APPLIANCE.
H fittings and modifications
Fitting the boiler and any controls may only be carried
out by an authorised person.
• Do not modify this appliance.
• Flue systems must not be modified in any way other
than as described in the fitting instructions. Any
misuse or unauthorised modifications to the boiler,
flue or associated components and systems could
invalidate the warranty. The manufacturer accepts
no liability arising from any such actions, excluding
statutory rights.
H Servicing
Advise the user to have the system serviced annually
by an authorised person. Approved spares must be
used to help maintain the economy, safety and
reliability of the boiler.
H Installation regulations
All gas boilers must be installed by an authorised
person in accordance with AS 3000, AS 5601 and
building regulations of relevant states and territories.
Failure to install boilers correctly could lead to
prosecution.
Standards
▶ Observe all regulations and standards applicable to
the system in your country prior to installation and
commissioning.
▶ Make sure the entire system satisfies the following
standards, regulations and directives.
Where no specific instruction is given, reference
should be made to the following standards:
• AS 1596 LPG storage and handling,
• AS 1697 Installation and maintenance of steel pipe
systems for gas,
• AS 1910 Water supply - float control valves for use
in hot and cold water,
• AS 3498 Authorization requirements for plumbing
products - water heaters and hot-water storage
tanks.
• AS 3500 National plumbing and drainage code,
• AS 4032 Water supply - valves for the control of hot
water supply temperatures,
• AS/NZS 5263.1.2 Gas fired water heaters for hot
water supply and/or central heating,
• AS/NZS 5601 Gas Installations,
• AS/NZS 3000 Electrical Installations.
H Liquefied Petroleum Gas (LPG)
A boiler using LPG gas must not be installed in a room
or internal space below ground level unless one side of
the building is open to the ground.
H Intended use
The appliance may only be installed in a sealed
unvented central heating system.
This appliance is intended for indoor use only.
It is not to be used for pool or spa pool applications.
Not suitable for commercial boosting of warm water
recirculation systems.
Using the appliance for any other purpose will be
considered incorrect use. Bosch accepts no liability
for any damage resulting from such use.
The commercial and industrial use of the appliance to
generate process heat is not permitted.