EasyManua.ls Logo

Bosch SSB255 - Page 55

Bosch SSB255
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SSB 6720818454 (2016/02) US
Commissioning log for the appliance | 55
Modied service functions: (select the modied service functions and enter the values here).
Example: Vent Length Parameter changed from 1 to 2
Heating control 850 MIN:
Vent length setting (par.99 “Flue length range”) 1 | 2 | 3 | 4
Gas type setting (par 98 “Gas Type”) NG | LPG
CH set point (par. 3) : DHW set point (par. 48) :
Other:
Heating control programmed, notes:
Documented the modied setting of the heating control in the control operating/ installation instructions
The following work has been carried out:
Electrical connections checked, notes:
Condensate trap lled Carry out a combustion air/ue gas test
Function check carried out Tightness test carried out on the gas and water sides
Commissioning includes checking the setting, a visual heating leak test and a functional check oh the boiler and control. The system installer conducts a
test of the heating system.
This system has been checked to the extent described. The documents have been handed over to the home owner/operator. The
home owner/operator has been instructed regarding safety and operation
of the boiler and accessories, including the need for regular scheduled
maintenance.
Name of service installing contractor Date, owner/operator signature
Afx the test report here.
Date, system installer’s signature

Table of Contents

Other manuals for Bosch SSB255

Related product manuals