Inspection/Maintenance | 27
8 716 473 216 (2014/09)Gaz 6000 W
13.2 Checklist for inspection and maintenance
Date
1 Call up the last fault saved in the electronics, service
function 1.6.A ( page 19).
2 Perform a visual check of the air/flue gas routing.
3 Check the gas supply pressure,
( page 22).
mbar
4 Check for leaks on the gas and water connections
( page 13).
5 Check heat exchanger, ( page 26).
6 Check burner ( page 26).
7 Check electrodes ( page 26).
8 Check the expansion vessel pre-charge
pressure matches the static head of the
heating system.
bar
9 Check the heating system pressure. bar
10 Check electrical wiring for damage.
11 Check the heating controller settings.
12 Check the set service functions.
Table 17