32 | Commissioning report for the appliance
Gaz 6000 W8 716 473 216 (2014/09)
Modified service functions: (Select the modified service functions and enter the values here.)
Example: service function 1.7.A changed from 00 to 01
Heating control unit:
Heating control unit set, notes:
Modified heating control unit settings documented in the controller operating/installation instructions
The following work has been carried out:
Electrical connections checked, notes:
Combustion air/flue gas test carried out
Function check carried out
Was a tightness test carried out on the gas and water sides?
Commissioning includes checking the settings, a visual boiler tightness test and a function check of the boiler and control unit. The system installer
conducts a test of the heating system.
If minor installation faults are identified on Bosch components during commissioning, Bosch is fully prepared to rectify these faults once consent
has been given by the customer. This does not imply any liability for the installation performance.
The system named above has been checked to the extent described.
___________________________________________________________
Name of service engineer
The documents have been handed over to the user. The user has been
made aware of the safety information and operation of the above-
mentioned heat source, including accessories. Attention has been
drawn to the requirement for regular maintenance of the above-
mentioned heating system.
__________________________________________________________
Date, user's signature
________________________________________________
Date, system installer's signature
Affix the test report here.