EasyManua.ls Logo

Bosch Worcester GREENSTAR CDi Series - Page 14

Bosch Worcester GREENSTAR CDi Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BOILER LOCATION &
CLEARANCES
aoomm
BATHROOMS:
750mm
The
boiler can be installed
in
zones 2 or
3.
If a
mechanical or
RF
mechanical timer or text dis-
®
@
CD
CD
play with room thermostat (IP 20 only)
is
fitted
the
boiler can only be installed
in
zone
3.
@
®
2250mm
A Non mechanical timer can be installed in
zone
2.
See lEE wiring regulations.
(See Technical Data for
IP
ratings.}
IMPORTANT:
any
switch
or
appliance
control using 230 V mains electricity
must
not
be
able
to
be
touched
by
a
person
using
the
bath
or
shower.
Electrical switches, fused
spur
and
socket
outlets
must
not
be
situated
in
the
bath-
aoomm
room.
750mm
For
further information about bathroom installa-
lions please consult Operational Procedures
Part
20, Electricity.
@
®
2250mm
600mm
radius
6720611927-13.10
BOILER LOCATION & CLEARANCES
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR
25CDI/30CDI/37CDI/42
co;
~ORCESTER
6 720
613
700a
(2006/11)
Bosch
Group

Related product manuals