BOILER LOCATION &
CLEARANCES
aoomm
BATHROOMS:
750mm
The
boiler can be installed
in
zones 2 or
3.
If a
mechanical or
RF
mechanical timer or text dis-
®
@
CD
CD
play with room thermostat (IP 20 only)
is
fitted
the
boiler can only be installed
in
zone
3.
@
®
2250mm
A Non mechanical timer can be installed in
zone
2.
See lEE wiring regulations.
(See Technical Data for
IP
ratings.}
IMPORTANT:
any
switch
or
appliance
control using 230 V mains electricity
must
not
be
able
to
be
touched
by
a
person
using
the
bath
or
shower.
Electrical switches, fused
spur
and
socket
outlets
must
not
be
situated
in
the
bath-
aoomm
room.
750mm
For
further information about bathroom installa-
lions please consult Operational Procedures
Part
20, Electricity.
@
®
2250mm
600mm
radius
6720611927-13.10
BOILER LOCATION & CLEARANCES
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR
25CDI/30CDI/37CDI/42
co;
~ORCESTER
6 720
613
700a
(2006/11)
Bosch
Group