I A
\ 22mm 15mm 22mm 15mm 22mm I
I I
\ I
' I
\ I
~~....
;I
............
,,""'
......
_____
.........
"'
,.""
( r
...
,""'
....
~
2
1'
I
::>
I
I
I
'
'
'
'
.........
·-.
.............
___
...
PRE-COMMISSIONING CHECKS
'
3
,''
I
I
I
I
I
I
I
I
I
I
I
'
'
'
'
'
'
'
'
'
'
'
'
'
.........
.........
~
~
k
~
\
\
\
\
\
\
\
I
I
I
I
I
I
'~
~-
.1.------------.,
·-
.
............
_---
....
·-
.
............
---
...
'
'
'
I
I
'
'
I
I
I
I
PRE-COMMISSIONING
CHECKS
CAUTION:
ISOLATE
THE
MAINS
SUPPLIES
BEFORE
STARTING
ANY
WORK
AND
OBSERVE
ALL
RELEVANT
SAFETY PRECAUTIONS
~
1.
Check that the service and water pipes
are
connected to the correct position
on
the
manifold.
A
·
CH
flow (22mm),
B
·
CH
return (22mm),
C
·Gas
inlet (22mm),
D
·
DHW
outlet
(15mm)
E · Mains water inlet
(15mm),
~
2.
Check the gas type specified
on
the iden·
tification plate
(F)
matches that of the gas
supply.
Turn
on
the
main
gas supply, check
the gas pipework, connections and rectify
any
leaks.
~
3.
Check that the pressure relief connector,
located
on
the right hand side at the bottom
of the
wall frame,
in
its up position.
~
4.
Check that the condensate pipe has been
connected to the adapter.
IMPORTANT:
If
the
boiler is
not
to
be
com-
missioned
immediately
then:
after
sucess-
fully
completing
all
of
the
checks and any
rectification work,
close
the
gas
and
water
valves,
shut
off
the
gas
supply
and electri-
cally isolate
the
boiler.
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR
25CDI/30CDI/37CDI/42
co;
~ORCESTER
6 720
613
700a
(2006/11)
Bosch Group