IMPORTANT:
All
the
following
Pre-Installation
sections
must
be
read
and
requirements
met
before
starting
boiler
or
flue
installation.
CAUTION: ISOLATE
THE
MAINS SUPPLIES BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
1
2
3
@
Valve
~
Flushing
Agent
~ORCESTER
Bosch Group
4
5
KEY
INSTALLATION
&
SERVICING
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
25CDV30CDV37CDci42CD•
6
720
613
700a
(2006/11)
CLEANING PRIMARY SYSTEMS
IMPORTANT: Debris from
the
system can
damage
the
boiler and reduce efficiency.
Failure to
comply
with
the
guidelines
for
the
use
of
water treatment with the appli-
ance will invalidate the appliance warranty.
BEFORE CLEANING THE SYSTEM:
ENSURE
THE
SYSTEM
AND PIPEWORK
IS
IN
GOOD
WORKING ORDER
KEEP
THE EXISTING BOILER/
CIRCULATING PUMP
WHERE
POSSIBLE
OR USE
A POWER FLUSHING MACHINE
TO
AID
THE
CLEANSING
PROCEDURE
BEFORE INSTALLING A NEW BOILER.
CLEANING THE PRIMARY SYSTEM:
Fill
the
system with cold water
and
check
for
leaks.
2 Open
all
drain cocks
and
drain
the
system.
3
Close drain cocks
and
add a suitable
flushing
agent at
the
correct strength for
the
system condition
in
accordance with
the
manufacturer's instructions.
~
Circulate
the
flushing agent before
the
boiler
is
fired
up.
4
Run
the
boiler/system at
normal
operating
temperature
as
directed
by
the
manufacturer
of
the
flushing agent.
5
Drain
and
thoroughly flush
the
system to
remove
the flushing agent and debris.
CLEANING PRIMARY SYSTEMS