EasyManua.ls Logo

Bosch Worcester Greenstar Ri ErP + Series - Clearances and Ventilation Information; Appliance Installation Clearances; Ventilation Requirements

Bosch Worcester Greenstar Ri ErP + Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
APPLIANCE INFORMATION
6 720 821 670 (2018/06)12
3.4 APPLIANCE MAIN COMPONENTS
1
23
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
6720804541-01.1Wo
1 Air/Gas Manifold
2 Sensor - appliance flow
3 Flow pipe
4 Return pipe
5 Removable servicing panel
6 Electrode assembly
7 Overheat thermostat
8 Silicon tube - Heat Exchanger air vent
9Heat Exchanger
10 Flue overheat thermostat
11 Access panel - Heat Exchanger/Sump cleaning
12 Return connector with drain point
13 Flow connector
14 Appliance Temperature control and Reset knob
15 Power and fault indicator (blue)
16 Wiring connections cover
17 Burner indicator (green)
18 Appliance ON/OFF switch
19 Condensate connection
20 Syphon / Trap
21 Gas inlet connection
22 Mains cable inlet
23 Gas Valve
24 Flue air pressure switch connection
25 Fan
26 Manual vent point
27 Fan pressure test point
28 Air pressure switch

Table of Contents

Other manuals for Bosch Worcester Greenstar Ri ErP + Series

Related product manuals