EasyManua.ls Logo

Bosch Worcester Greenstar Ri ErP + Series - Prepare for Operation; Open Vented Heating Systems; Sealed Heating Systems Operation

Bosch Worcester Greenstar Ri ErP + Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
APPLIANCE INFORMATION
6 720 821 670 (2018/06) 7
3 APPLIANCE INFORMATION
3.1 APPLIANCE
Fig. 1 Appliance
1
2
3
6
6720813283-02.1Wo
390mm
270mm
*600mm to top of case front
590mm*
4
5
Do not use the pre-formed copper pipes supplied with
the appliance for the gas supply.
These copper pipes are for water only.
STANDARD PACKAGE:
1 Wall hung gas fired condensing regular appliance for central
heating and domestic hot water
2 Tail pipes - water only
3 Wall plate
4 Hardware literature pack (see checklist)
5ErP Label
6 Bottom panel and wall mounting template
CHECK LIST
- HARDWARE LITERATURE PACK:
Qty.
Appliance Installation, Commissioning and Servicing
Instructions
1
Users Instructions 1
Consumer Guarantee Card 1
Sealing Pack: 1
- Compression Nut 22mm 3
- Compression Ring 22mm 3
Elbow assembly pack 1
- Elbow Assembly 1
- Fibre Washer 1
Table 4 Hardware lit pack - checklist

Table of Contents

Other manuals for Bosch Worcester Greenstar Ri ErP + Series

Related product manuals