EasyManua.ls Logo

Bosch WORCESTER GREENSTAR - Electrical connection - Step 3; Electrical connection - Step 4; Electrical connection - Step 5; Electrical connection - Step 6

Bosch WORCESTER GREENSTAR
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
GREENSTAR WIRING CENTRE – 6720880441 (2018/01)
8
Electrical connection – Step 3
1. Remove grommets from the module.
2. Route cable through a grommet.
3. Remove plug from the socket.
4. Connect cable to plug and ensure that it is connected to the right
terminals ( chapter 3.3).
5. Route cable through the same grommet.
6. Remove plug from the socket.
7. Connect cable to plug and ensure that it is connected to the right
terminals ( chapter 3.3).
Fig. 13 Electrical connection – Step 3
Electrical connection – Step 4
1. Put the grommet used in Step 3 back into place.
2. Plug in first connected plug from where it was removed.
3. Plug in second connected plug from where it was removed.
Fig. 14 Electrical connection – Step 4
Electrical connection – Step 5
Secure cables connected in Steps 1-4 with the strain relief supplied.
Fig. 15 Electrical connection – Step 5
Electrical connection – Step 6
1. Route cable through a grommet.
2. Remove plug from the socket.
3. Connect cable to plug and ensure that it is connected to the right
terminals ( chapter 3.3).
4. Remove plug from the socket.
5. Connect cable to plug and ensure that it is connected to the right
terminals ( chapter 3.3).
6. Route cable through the same grommet.
7. Remove plug from the socket.
8. Connect cable to plug and ensure that it is connected to the right
terminals ( chapter 3.3).
Fig. 16 Electrical connection – Step 6
2.
5.
5.
7.
7.
6.
6.
3.
≥ 20 mm
1.
4.
0 010 013 192-001
1.
3.
2.
0 010 013 193-001
0 010 013 194-001
3.
3.
1.
1.
4.
4.
6.
6.
8.
8.
7.
7.
≥ 20 mm
5.
5.
2.
2.
0 010 013 195-001

Related product manuals