KEY TO SYMBOLS AND SAFETY PRECAUTIONS | 5AU/NZ
6 720 646 195a (2010/11)
Boiler features and checklist
• Pre-wired and pre-plumbed
• Galvanised steel inner frame
• Digital control system
• Intelligent controls
• Automatic ignition
• Direct burner ignition electrodes
• Built-in frost protection
• Built-in fault finding diagnostics
• Modulating automatic gas valve
• Combustion air fan with speed regulator
• CH temperature sensor & control
• Pump anti-seizure protection
• Flue gas temperature sensor
• Condensate syphonic trap
• Temperature control
Check list
- Hardware literature pack:
Qty.
Installation instructions 1
User instructions 1
Warranty card 1
Sealing pack: 1
- Compression nut 22mm 3
- Compression ring 22mm 3
- Compression nut 15mm 3
- Compression ring 15mm 3
- Fibre washer 18.6 x 13.5 x 1.5 2
- Fibre washer 23.9 x 17.2 x 1.5 2
- Bonded washer 3/4“ for gas 1
Adapter, 22mm to R¾ 3
Adapter, 15mm to R½ 1
Syphon assembly 1
Warranty return envelope 1
Tab. 4 Checklist