34
9 Control System and Programs 9
Program sequence (example):
Without Slimsorba
P10 Microfibers and special sportswear
with interval spinning
1
st
bath: Pre-cleaning in pump circuit,
45 seconds pumping up from tank I, pump circuit low level,
2 minutes pump circuit,
1 minute 30 seconds pumping out and spinning to distillation.
2
nd
bath: Filtration
1 minute pumping up from tank I in pump circuit, high level, addition
1 minute pumping from tank II, pump circuit high level,
4 minutes filtration,
30 seconds pumping to tank I,
1 minute 30 seconds spinning to tank I.
3
rd
bath: Rinsing
45 seconds pumping from tank II, pump circuit low level,
1 minute pump circuit,
30 seconds pumping to tank II,
30 seconds spinning to tank II,
30 seconds spinning run down,
1 minute tumbling
1 minute spinning to tank II,
45 seconds spinning run down,
1 ½ minutes spinning to tank II,
45 seconds spinning run down,
Spraying
3½ minutes 30 tumbling.
Drying
3 minutes predrying, low air flow,
13 minutes drying, high air flow, thermostat I 50 °C (122 °F),
x minutes delay time, drying time controller,
4 minutes afterdrying, high air flow, thermostat I 50 °C (122 °F),
2 - 6 3 minutes reduction (temperature-controlled)
Wrinkle protection: If you do not press the STOP button at the cycle end, the wrinkle
protection deodorizing with gentle reversing continues to run.
The machine automatically stops and locks after a maximum of 7 minutes.
You cannot open it until program P34 has run.
P25/P30